FIDECIX SUPPLIERS 2023

 

 

CLUSTER44 Added: 15/March/2023

Description:INDUSTRIAL MAINTENANCE / COST DEPENDS ON THE WORK PERFORMED

Delivery time: 20 DAYS

Social security: YES

Certification: YES

Minimum order quantity: 1

Maximum order quantity: 100

Credit days: NO

Download Cover Letter

JARA GROUP

Description: INDUSTRIAL MAINTENANCE, REMODELING AND EXTENSIONS OF INDUSTRIAL BUILDINGS.

Delivery time:30 DAYS

Social security:YES/p>

Certificación: REPSE

Minimum order quantity: 1

Maximum order quantity: 3

Credit days: 30 DAYS

Download Cover Letter

CONSTRUTEK

Description:ARCHITECTURAL DESIGN

Delivery time: 2 TO 5 DAYS

Social security:YES

Certificación: YES

Minimum order quantity: 1

Maximum order quantity: 10

Credit days: NO

Download Cover Letter

PROJECTS AND WORKS CARRETERAS MEXICANAS SA OF CV

Description: ASPHALT PAVEMENTS $4320 PRICE PER M3

Delivery time: 15 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 50

Maximum order quantity:NO LIMIT

Credit days: NO

Download Cover Letter

DAPSA ENGINEERING SA OF CV

Description: CIVIL WORKS, MANUFACTURE AND ASSEMBLY OF STRUCTURES, MANEUVERS WITH INDUSTRIAL CRANES, APPLICATION OF SAND BLAST, MANUFACTURE AND ASSEMBLY OF STAINLESS STEEL PIPES

Delivery time: 5 A 20 DAYS

Social security: YES

Certificación: REGARDING SECURITY, WE HAVE DC3 TRAINING FOR THE DIFFERENT ACTIVITIES THAT ARE CARRIED OUT DURING THE EXECUTION OF OUR PROJECTS

Minimum order quantity:1000

Maximum order quantity: 20000000

Credit days: 30 DAYS

Download Cover Letter

PAPALOTL BUSINESS GROUP

Description:INDUSTRIAL CLEANING, INDUSTRIAL MAINTENANCE

Delivery time: 15 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 5000 METROS CUADRADOS

Maximum order quantity: NO LIMIT

Credit days: NO

Download Cover Letter

ASEDIM2 MAINTENANCE AND CONSTRUCTION S.A. DE C.V.

Description: GENERAL MAINTENANCE OF INDUSTRIAL BUILDINGS AND INDUSTRIAL EQUIPMENT. AVERAGE PRICE $205,000.00 PLUS TAXES.

Delivery time: 21 DAYS

Social security: YES

Certificación: PROCESSING OF THE FOLLOWING. ISO9001:2015.

Minimum order quantity: 1 MAINTENANCE

Maximum order quantity: NO LIMIT

Credit days: 21 CREDIT DAYS

Download Cover Letter

ESENCIAL

Description:CONSTRUCTION AS REMODELING AND SECURITY SYSTEMS

Delivery time:FROM 3 TO 5 DAYS DEPENDING ON PRODUCT OR SERVICE

Social security: YES

Certificación: YES

Minimum order quantity:100MTS

Maximum order quantity: 3000MTS

Credit days: NO

Download Cover Letter

RUBA GROUP, ENGINEERING, CONSTRUCTION AND ARCHITECTURE

Description:DESIGN AND/OR CURRENT OPINION OF FACTORY STRUCTURES

Delivery time: 30 DAYS

Social security: YES

Certificación: YES

Minimum order quantity:ONE SHIP

Maximum order quantity: NO LIMIT

Credit days: 30 DAYS

Download Cover Letter

CONSTRUCTION AND DIGITAL ARCHITECTURE SA OF CV

Description: INDUSTRIAL MAINTENANCE AND CONSTRUCTION OF INDUSTRIAL BUILDINGS

Delivery time: 15 TO 180 DAYS

Social security: YES

Certificación: YES

Minimum order quantity:20

Maximum order quantity: 5000

Credit days: NO

Download Cover Letter

PROJECTS MAINTENANCE AND INDISTRIAL SERVICES

Description:MANUFACTURE OF PRODUCTION MEANS AND MAINTENANCE SERVICE TO EQUIPMENT AND FACILITIES

Delivery time: 2 DAYS

Social security: YES

Certificación: YES

Minimum order quantity:

Maximum order quantity: 672

Credit days: NO

Download Cover Letter

FERNANDO LEON ORTIZ MAQUINADO

Description: INDUSTRIAL MAINTENANCE SERVICES

Delivery time:15 DAYS

Social security: YES

Certificación: YES

Minimum order quantity:50

Maximum order quantity: 150

Credit days: NO

Download Cover Letter

CONSTRUCTION COMPANIES AND INDUSTRIAL SERVICES M&Q

Description:STRUCTURAL MAINTENANCE SERVICES COST DEPENDING ON THE SERVICE

Delivery time: FROM 3 TO 5 BUSINESS DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 1

Maximum order quantity: 1000

Credit days: FROM 15 TO 30 CALENDAR DAYS

Download Cover Letter

ROSEND MULTI SERVICES

Description: CONSTRUCTION AND MAINTENANCE SERVICES

Delivery time: 30 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 1

Maximum order quantity: NO LIMIT

Credit days: 20 DAYS

Download Cover Letter

CONSTRUCTORA ATLANGATEPEC SA OF CV

Description:PAVING BUILDING ROAD ROADS DRAINAGE AND DRINKING WATER TREATMENT PLANTS

Delivery time: 30 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 15000

Maximum order quantity: 45000000

Credit days: NO

Download Cover Letter

CONSTRUCTION GROUP NORORIENTE DE TLAXCALA SA OF CV

Description:CONSTRUCTION OF ROADS AND COMMERCIAL BUILDINGS, THE AVERAGE COST PER SQUARE METER OF PABLO-BASED ROADS IS AT $1500 SQUARE METER

Delivery time: 15 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 100 SQUARE METERS

Maximum order quantity: 10000 SQUARE METERS

Credit days: 30

Download Cover Letter

DAPSA ENGINEERING SA OF CV

Description:CIVIL WORKS, PAILING, PROCESS PIPES, STRUCTURES, RENT OF PERSONNEL LIFTING PLATFORMS, RENT OF INDUSTRIAL CRANES, MACHINERY MANEUVERS, APPLICATION OF SAND BLAST

Delivery time: 5 TO 20 DAYS

Social security: YES

Certificación: REGARDING SECURITY, WE HAVE DC3 TRAINING FOR THE DIFFERENT ACTIVITIES THAT ARE CARRIED OUT DURING THE EXECUTION OF OUR PROJECTS

Minimum order quantity: 1000

Maximum order quantity: 20000000

Credit days: 30 DAYS

Download Cover Letter

VOSKI GROUP SA OF CV

Description: CONSTRUCTION COMPANIES SALE AND INSTALLATION OF SPORTS COURTS AND SPACES

Delivery time: 3 TO 5

Social security: YES

Certificación: YES

Minimum order quantity: 300000

Maximum order quantity: 4000000

Credit days: NO

Download Cover Letter

INDUSTRIAL MACHINERY XALOZTOCC

Description:MANUFACTURE OF ANY METAL MECHANICAL PIECE THE PRICE DEPENDS ON THE WORK TO BE CARRIED OUT

Delivery time: 1 TO 5 DAYS

Social security: NO

Certificación: YES

Minimum order quantity: 1

Maximum order quantity: 100

Credit days: 30 DAYS

Download Cover Letter

TUVAN CONSTRUCTION

Description:CIVIL WORKS (PAVING) $7,830.00 M2 - INDUSTRIAL MAINTENANCE (PAINTING) $120.00 M2

Delivery time: 6 - 8 DAYS

Social security: YES

Certificación: 1.- USE, PRESERVATION, MAINTENANCE, REPLACEMENT AND DISPOSAL OF BASIC AND SPECIFIC PERSONAL PROTECTION EQUIPMENT. 2.- HANDLING OF FIRE EXTINGUISHERS. 3.- WORK AT HEIGHT. 4.- HOT WORKS. 5.- INDUSTRIAL SAFETY SUPERVISOR TRAINING. 6.- BLOCKING AND TAGGING LOT. 7.- CONFINED SPACES. 8.- SAFETY IN EXCAVATION. 9.- ASSEMBLY OF SCAFFOLDING. 10.- MANEUVERS AND LIFTING.

Minimum order quantity: 50000

Maximum order quantity: 80000

Credit days: 30 DAYS

Download Cover Letter

XISAR INDUSTRIAL AND RESIDENTIAL MAINTENANCE OF APIZACO

Description: MATENIMIENTO INDUSTRIAL

Delivery time: FROM 5 TO 7 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 1

Maximum order quantity: NO LIMIT

Credit days: 30 DAYS

Download Cover Letter

POLIVOM WHEELS AND CASTERS

Description: MAINTENANCE OF INDUSTRIAL EQUIPMENT

Delivery time: 3 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 10

Maximum order quantity: 10000

Credit days: 30 DAYS

Download Cover Letter

FELIPE PÉREZ MIRÓN

Description:MAINTENANCE, LAYING OF NEW HYDRAULIC AND SANITARY LINE. AND ALL THE INSTALLATIONS OF THE CONSTRUCTION.

Delivery time:FROM 15 TO 30 DAYS DEPENDING ON THE VOLUME

Social security: YES

Certificación:THE MATERIALS USED HAVE A CONAGUA CERTIFICATE. AND THEY ARE UNDER RULES

Minimum order quantity: 1 WORK

Maximum order quantity: NO LIMIT

Credit days: NO

Download Cover Letter

HERSOL METALLIC CONSTRUCTIONS SA OF CV

Description: MAINTENANCE OF MACHINERY, INDUSTRIAL ASSEMBLY, CUTTING, BENDING AND ROLLING OF SHEETS, PIPES, STRUCTURES, PAINTING, REMODELING AND MAINTENANCE OF FACILITIES

Delivery time: 30 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 1 MAINTENANCE

Maximum order quantity: NO LIMIT

Credit days: 15 TO 30 DAYS

Download Cover Letter

CONSTRUCTION SUPERVISION AND CONSULTING LOMA SA OF CV

Description:EXPANSION OF THE SANITARY DRAINAGE NETWORK, DESIGN AND CONSTRUCTION OF PUBLIC WORKS

Delivery time: 90 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: $500,000

Maximum order quantity: $11,000,000

Credit days: NO

Download Cover Letter

RM CONSTRUCTIONS & TI SA OF CV

Description:CONSTRUCTION OF PUBLIC WORKS

Delivery time: 30 DAYS

Social security: YES

Certificación: YES (CISCO)

Minimum order quantity: 1 WORK

Maximum order quantity: 10 WORKS

Credit days: 15 DAYS

Download Cover Letter

TECHNO-ENGINEERING

Description:STUDIES OF SOIL MECHANICS AND STRUCTURAL PROJECTS THE PRICE VARIABLES ACCORDING TO THE PROJECT

Delivery time: 7 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 5 PROJECTS PER WEEK

Maximum order quantity: 9 PROJECTS PER WEEK

Credit days: 10 DAYS

Download Cover Letter

CREATIVE OFFICE EL PAPALOTE

Description:CONSTRUCTION OF PUBLIC WORKS

Delivery time: FROM 10 TO 500 DAYS (IN MAJOR WORKS)

Social security: YES

Certificación: YES

Minimum order quantity: 1 WORK

Maximum order quantity: 100 WORKS

Credit days: NO

Download Cover Letter

FAHR

Description:SALE OF HYDRAULIC AND SEWERAGE MATERIALS SUCH AS: CORRUGATED PIPE FROM 4" TO 24" PVC 4" TO 24"

Delivery time: 1 TO 3 DAYS

Social security: YES

Certificación:YES (ALL PRODUCTS ARE CERTIFIED BY CONAGUA)

Minimum order quantity: 5 PIECES

Maximum order quantity: 50 PIECES

Credit days: NO

Download Cover Letter

FELIPE PÉREZ MIRÓN

Description:4" PAD THERMOFUSION FOR COOLING LINE FOR SHILER. LAYING OF 3" GALVANIZED LINE FOR DRINKING WATER SUPPLY

Delivery time: x15 TO 30 DAYSx

Social security: YES

Certificación: YES

Minimum order quantity: 1 MODIFICATION

Maximum order quantity: NO LIMIT

Credit days: NO

Download Cover Letter

ATRIUM EIGHT SEVEN

Description: CONSTRUCTION, REMODELING, DESIGN AND DECORATION OF INTERIOR SPACES, MANUFACTURE OF FURNITURE.

Delivery time: 15 TO 30 DAYS

Social security: YES

Certificación: YES

Minimum order quantity:FROM THE DESIGN OF A FURNITURE

Maximum order quantity:THE EXTERIOR AND INTERIOR DESIGN OF THE ENTIRE COMPANY

Credit days: NO

Download Cover Letter

CONSTRUCTOR AND BUILDING ARVIK SA OF CV

Description: INDUSTRIAL MAINTENANCE AND EQUIPMENT RENTAL

Delivery time: 1 DAY

Social security: YES

Certificación: YES (SAFETY AND HYGIENE)

Minimum order quantity: 4 PIECES

Maximum order quantity: 8 PIECES

Credit days: 45 DAYS

Download Cover Letter

CONSTRUCTION AND DIGITAL ARCHITECTURE SA OF CV

Description:INDUSTRIAL MAINTENANCE AND CONSTRUCTION OF INDUSTRIAL BUILDINGS

Delivery time: 15 TO 180 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 20 PIECES

Maximum order quantity: 5000 PIECES

Credit days: NO

Download Cover Letter

CALCULATE IT

Description:STRUCTURAL OPINIONS, INTERNAL CIVIL PROTECTION PROGRAMS

Delivery time: 15 DAYS

Social security: YES

Certificación: YES (CERTIFICATIONS TO STANDARDS: EC0594, EC0907, EC0908, EC0048, EC0217, EC0479, EC0594, EC1092)

Minimum order quantity: 1 PIECES

Maximum order quantity: 15 PIECES

Credit days: 15 DAYS

Download Cover Letter

TERRYCAM CONSTRUCTION GROUP

Description: ISOLATED SURFACE PATCH WITH HOT MIX

Delivery time: FROM 15 TO 200 DAYS IN LONGER TIMES

Social security: YES

Certificación: YES

Minimum order quantity: 5 M3

Maximum order quantity: 10 M3

Credit days: NO

Download Cover Letter

MAC MATERIALS

Description:INDUSTRIAL SAFETY - WATERTANKS & CISTERNS - CORRUGATED PIPE

Delivery time: 1 DAY

Social security: NO

Certificación:ANSI/ISEA-Z89.1 AND NOM-115-STPS STANDARDS

Minimum order quantity: 5 PIECES

Maximum order quantity: 20 PIECES

Credit days: 30 DAYS

Download Cover Letter

MACHINING AND INDUSTRIAL REPAIRS FACTORY

Description: MACHINING, REPAIRS AND MECHANICAL SERVICES

Delivery time: 15 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: $75,000

Maximum order quantity: $150,000

Credit days: 15 DAYS

Download Cover Letter

ARTURO ÁGUILAR PÉREZ

Description:WORK CONTRUCTION AND MAINTENANCE OF GREEN AREAS

Delivery time: SAME DAY

Social security: YES

Certificación: YES (REPSE)

Minimum order quantity: 500 M2

Maximum order quantity: 50,000 M2

Credit days: 20 DAYS

Download Cover Letter

FA GROUP

Description:CONSTRUCTION OF URBANIZATION WORKS AND OTHER CIVIL ENGINEERING CONSTRUCTIONS U HEAVY WORKS. PRICE VARIABLE

Delivery time: 90 DAYS

Social security: NO

Certificación: YES

Minimum order quantity: VARIABLE

Maximum order quantity: VARIABLE

Credit days: VARIABLE

Download Cover Letter

TLAXCALA CONSTRUCTION GROUP

Description: CONSTRUCTION SERVICES, GENERAL MAINTENANCE, SPECIAL SERVICES.

Delivery time: 20 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 1 MAINTENANCE SERVICE

Maximum order quantity: 20 MAINTENANCE SERVICES

Credit days: 15 A 30 DAYS

Download Cover Letter

SKM&L BUILDINGS, SA OF CV.

Description: CIVIL WORKS (REMODELS, EXTENSIONS, SPECIAL INSTALLATIONS)

Delivery time: 60 DAYS

Social security: YES

Certificación:YES (FIC CERTIFICATE (CMIC) CONSTRUCTION)

Minimum order quantity: $150, 000

Maximum order quantity: $34, 000, 000

Credit days: 30 DAYS

Download Cover Letter

ADECO

Description:MAINTENANCE TO BUILDINGS, PAINTING, DRYBOARD AND HYDROSANITARY INSTALLATIONS. AVERAGE PRICE OF THE LAST CONTRACTS $90,000 MN

Delivery time: 15 DAYS

Social security: NO

Certificación: YES

Minimum order quantity: VARIABLE

Maximum order quantity: VARIABLE

Credit days: VARIABLE

Download Cover Letter

OSCAR PÉREZ CRUZ

Description:ELECTRICAL INSTALLATIONS, TELECOMMUNICATIONS, CIVIL WORKS AND GENERAL MAINTENANCE PROJECTS

Delivery time: 5 DAYS

Social security: NO

Certificación: YES

Minimum order quantity: 1 INSTALLATION

Maximum order quantity: 3000 INSTALLATIONS

Credit days: NO

Download Cover Letter

GUSTAVO ISRAEL SANTIAGO AHUJA

Description:MAINTENANCE, CIVIL, ELECTRICAL AND HYDRAULIC WORKS CONSTRUCTION

Delivery time: BETWEEN 2 AND 60 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: VARIABLE

Maximum order quantity: VARIABLE

Credit days: 15 A 30 DAYS

Download Cover Letter

CONSTRUCTIONS AND ENGINEERING MCL

Description:SITE CONSTRUCTION, STRUCTURAL ANALYSIS AND DESIGN AND INDUSTRIAL MAINTENANCE

Delivery time: 14 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 1 MAINTENANCE

Maximum order quantity: 50000 MAINTENANCES

Credit days: 30 DAYS

Download Cover Letter

FRANCISCO JAVIER PÉREZ POLO

Description:CONSTRUCTION AND MAINTENANCE OF INFRASTRUCTURE

Delivery time: 5 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 1000 M2

Maximum order quantity: 30000 M2

Credit days: 15 DAYS

Download Cover Letter

ASEDIM2 MAINTENANCE AND CONSTRUCTION S.A. DE C.V.

Description: GENERAL MAINTENANCE OF INDUSTRIAL BUILDINGS AND INDUSTRIAL EQUIPMENT

Delivery time: 21 DAYS

Social security:YES AND STRICTURAL ARCHITECTURAL DESIGNED BUILDINGS

Certificación:YES (WE ARE IN THE PROCESS OF PROCESSING THE FOLLOWING. ISO9001:2015.)

Minimum order quantity: 50 M2

Maximum order quantity: NO LIMIT

Credit days: 21 Credit days

Download Cover Letter

JESÚS JOAN MÚÑOZ CRUZ

Description:EXECUTIVE ENGINEERING PROJECTS, ANALYSIS AND DESIGN OF CONCRETE AND STEEL STRUCTURES, PAVEMENT DESIGN, STRUCTURAL REPORTS, ETC.

Delivery time: 14 DAYS

Social security: YES

Certificación: YES (DRO)

Minimum order quantity: 1 PROJECT

Maximum order quantity: 50 PROJECTS

Credit days: x30 DAYSx

Download Cover Letter

DELGADO ARCHITECTS

Description: CONSTRUCTION OF PUBLIC AND PRIVATE WORKS

Delivery time: 20 DAYS

Social security: NO

Certificación: YES

Minimum order quantity: 1 DESIGN

Maximum order quantity: 1000 DESIGNS

Credit days: NO

Download Cover Letter

H&R CONSTRUCTIONS SA OF CV

Description:URBANIZATION AND INDUSTRIAL MAINTENANCE

Delivery time: 30 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 1 WORK

Maximum order quantity: 10 WORKS

Credit days: 30 DAYS

Download Cover Letter

INTERNATIONAL REAL ESTATE EST 1980 SA OF CV

Description: MAINTENANCE TO INDUSTRIAL EQUIPMENT

Delivery time: 7 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 1

Maximum order quantity: 1000

Credit days: 15 DAYS

Download Cover Letter

CRISSA CONSTRUCTIONS

Description:STRUCTURES FURNITURE REMODELS

Delivery time: DEPENDING ON THE DIMENSIONS

Social security: YES

Certificación: YES

Minimum order quantity: 25

Maximum order quantity: 45

Credit days: 30 DAYS

Download Cover Letter

GRMAQ OF APIZACO

Description: CONSTRUCTION MACHINERY, SALE, RENT AND MAINTENANCE

Delivery time: 3 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 1

Maximum order quantity: 30

Credit days: 30 DAYS

Download Cover Letter

LEONARDO CÁRDENAS HERNÁNDEZ

Description:GENERAL CONSTRUCTION, CIVIL WORKS, ELECTRICAL INSTALLATIONS AND PAILERY

Delivery time: 15 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 1

Maximum order quantity: 10

Credit days: NO

Download Cover Letter

ETNIA ROLDAN ESPINO

Description:30000, ALUMINUM, TILE, SHEET, MASONRY, PLUMBING

Delivery time: 2 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 1 OBRA

Maximum order quantity: NO LIMIT

Credit days: 3 MONTHS

Download Cover Letter

ANGEL FILIBERTO ROMERO HERNANDEZ

Description:CONSTRUCTION OF PABLO STREETS IN THE COLONIA XICOTENCATL MUNICIPALITY OF HUAMANTLA CONTRACT FOR 1,150,000.00, DESIGN OF A TREATMENT PLANT IN THE COMMUNITY OF ALTAMIRA MUNICIPALITY OF HUAMANTLA CONTRACT FOR 250,000.00 CONSTRUCTION OF A COLLECTOR IN THE COLONIA NUEVO SAN JUAN MU HUAMANTLA NICIPALITY CONTRACT FOR 3,420,000.00 CONSTRUCTION OF SURVEILLANCE BOOTH IN INDUSTRIAL CORRIDOR XICOTENCATL II MUNICIPALITY OF HUAMANTLA CONTRACT FOR 1,650,000.00 REPAVEMENT WITH ASPHALT ROAD ON THE ROAD TO CAZATOTLA LOCATION OF ACUITLAPILCO MUNICIPALITY OF TLAXCALA CONTRACT FOR 1,150,000.00

Delivery time:DEPENDS ON THE CONSTRUCTION AND/OR DESIGN

Social security: YES

Certificación: YES

Minimum order quantity: 1 CONSTRUCTION

Maximum order quantity: 8 WORKS PER YEAR

Credit days: NO

Download Cover Letter

HUBA Y ASOCIADOS CONSTRUCTORES SA OF CV

Description:CIVIL WORKS CONSTRUCTION

Delivery time: 90 DAYS

Social security: YES

Certificación: YES (REPSE)

Minimum order quantity: 1 WORK

Maximum order quantity: 7 WORKS

Credit days: 15 DAYS

Download Cover Letter

TECHNICAL CONSTRUCTIONS MIRY S. OF RL OF CV

Description:INDUSTRIAL MAINTENANCE IN GENERAL, EQUIPMENT RENT, CRANES, GENYS ETC.

Delivery time: 1 WEEK

Social security: YES

Certificación: YES (CMIC)

Minimum order quantity: $15,000

Maximum order quantity: $300,000

Credit days: 60 DAYS

Download Cover Letter

PROJECTS AND WORKS CARRETERAS MEXICANAS SA OF CV

Description:ASPHALT PAVEMENTS

Delivery time: 15 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 1 WORK

Maximum order quantity: NO LIMIT

Credit days: WE DO NOT GRANT CREDIT

Download Cover Letter

JOSÉ ROBERTO LEAL ESTEBAN

Description:DRILLING AND REHABILITATION OF DEEP WELLS, EQUIPMENT AND REPAIR OF PUMPING EQUIPMENT

Delivery time: 5 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 1 POZO

Maximum order quantity: 50 POZOS

Credit days: WE DO NOT GRANT CREDIT

Download Cover Letter

CIVIL CONSTRUCTIONS MALINTZI SA OF CV

Description: GENERAL CIVIL WORKS CONSTRUCTIONS

Delivery time:ACCORDING TO THE MAGNITUDE OF WORK

Social security: YES

Certificación: YES

Minimum order quantity: 5 SHARES

Maximum order quantity: 10 SHARES

Credit days:WE DO NOT GRANT CREDIT

Download Cover Letter

EUGENIUS CAR GROUP S.A. DE C.V.

Description: CONSTRUCTION OF ROOFS, INDUSTRIAL MAINTENANCE, RENOVATION, ETC.

Delivery time: 60 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 2 ORDERS

Maximum order quantity: 3 ORDERS

Credit days: 35 DAYS

Download Cover Letter

ARCHITECTURAL OFFICE ARTURO VÁZQUEZ ARCHITECT

Description: GENERAL CONSTRUCTION OF CIVIL WORKS

Delivery time: 3 A 180 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 50000

Maximum order quantity: 15000000

Credit days: NO

Download Cover Letter

XAMEL SA OF CV CONSTRUCTION GROUP

Description:MAINTENANCE AND SERVICES TO THE PRIVATE INDUSTRY

Delivery time: 6 MONTHS

Social security: YES

Certificación: YES

Minimum order quantity: 1 WORK

Maximum order quantity: 10 WORKS

Credit days: NO

Download Cover Letter

QUICIMEL PROJECT ENGINEERS

Description:BASIC AND DETAIL ENGINEERING IN CIVIL, STRUCTURAL AND ELECTRICAL PROCESSES

Delivery time: 3 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 100,000

Maximum order quantity: 2,000,000

Credit days: 15 DAYS

Download Cover Letter

JOSÉ DANIEL CARREÓN PARADA

Description: URBANIZATION, ROADS, ELECTRIFICATION, REHABILITATION OR CONSTRUCTION OF INDUSTRIAL BUILDINGS AND WAREHOUSES.

Delivery time:ACCORDING TO THE MAGNITUDE OF WORK

Social security: YES

Certificación: YES

Minimum order quantity: 1,000,000

Maximum order quantity: 10,000,000

Credit days: NO

Download Cover Letter

PROJEKTE EMD

Description:INDUSTRIAL MAINTENANCE, REMODELING AND ELECTRIFICATION.

Delivery time: 30 DAYS

Social security: YES

Certificación: YES (ISO 9001)

Minimum order quantity: 5 ORDERS

Maximum order quantity: 20 ORDERS

Credit days: DE 30 A 60 DAYS

Download Cover Letter

ASSOCIATED BUILDERS OF PUEBLA SA OF CV

Description: PAVING, INSTALLATION OF POTABLE WATER NETWORK, SEWER SYSTEM NETWORK.

Delivery time: 30 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 300 M

Maximum order quantity: 2000 M

Credit days: NO

Download Cover Letter

ENGINEERING DESIGN CONSTRUCTION AND TOPOGRAPHY INDIAN

Description:REMODELING, FINISHES, TOPOGRAPHY, BENCHES AND TRIMING.

Delivery time: 1 MONTH

Social security: YES

Certificación: NO

Minimum order quantity: 1,000m2

Maximum order quantity: 10,000 m2

Credit days: 20 DAYS

Download Cover Letter

DICA HG CONSTRUCTIONS SA OF CV

Description:CONSTRUCTION, REHABILITATION, AND MAINTENANCE SERVICES

Delivery time:DEPENDING ON THE PROJECT

Social security: YES

Certificación: YES

Minimum order quantity: 1 WORK

Maximum order quantity: NO LIMIT

Credit days: 60 DAYS

Download Cover Letter

PROJECTS AND CONSTRUCTIONS "ATELIER"

Description:CONSTRUCTION OF CIVIL WORKS AND INDUSTRIAL MAINTENANCE.

Delivery time: 30 DAYS

Social security: RESPONSIBLE WORKS DIRECTOR

Certificación: YES

Minimum order quantity: 1

Maximum order quantity: 5

Credit days: NO

Download Cover Letter

PROMASE

Description:MANUFACTURE OF ACCESSORIES FOR PRODUCTION IN THE INDUSTRIAL SECTOR

Delivery time: 2 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 570 PRODUCTS

Maximum order quantity: 672 PRODUCTS

Credit days: NO

Download Cover Letter

GEODESIKA

Description:TOPOGRAPHICAL STUDIES

Delivery time: 2 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 1

Maximum order quantity: 5

Credit days: 30 DAYS

Download Cover Letter

BILBERT DEGALES MORALES

Description:INDUSTRIAL MAINTENANCE, CLEANING, $5000 WATER PIPE $900

Delivery time: SAME DAY

Social security: YES

Certificación:YES (REPSE REGISTRY)

Minimum order quantity: 1

Maximum order quantity: 10

Credit days: NO

Download Cover Letter

INTEGRATING GLOBAL BUSINESS SOLUTIONS 0922 S DE RL

Description: WATERPROOFING IN INDUSTRIAL SPACES

Delivery time: 12 DAYS

Social security: YES

Certificación: YES (DC3)

Minimum order quantity: 100

Maximum order quantity: 500

Credit days: 10 DAYS

Download Cover Letter

SIIPSA DYES S.A. DE C.V.

Description:CONSTRUCTION AND REMODELING SERVICE, WATERPROOFING, PRODUCTION OF PROCESS PIPES, ELABORATION OF METAL STRUCTURES, MANUFACTURING, SUPPLY AND PLACEMENT OF VERTICAL AND HORIZONTAL SIGNAGE.

Delivery time: FROM 20 TO 90 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 20 M2

Maximum order quantity: 3150 M2

Credit days: 30-90 DAYS

Download Cover Letter

COVO INDUSTRIAL GROUP SA OF CV

Description: MACRO TANK STANLEY MACRO TANK ECOLOGICAL PARK MACRO TANKS TLAJOMULCO MAINTENANCE TANK AGUA DE PUEBLA CURRENTLY WORKING ON THE MACRO TANK PROVIDENCIA IN CUAUTITLAN IZCALLI

Delivery time: FROM 5 TO 60 WEEKS

Social security: YES

Certificación: API 650, API 620, ASME, AWWA D100 NSF FM APPROVED

Minimum order quantity: 1

Maximum order quantity: 10

Credit days: 6 TO 48 MONTHS

Download Cover Letter

SEMIDIASA SA OF CV

Description:LEASING OF INDUSTRIAL CRANES AND LIFTING PLATFORMS, CONSTRUCTION OF INDUSTRIAL BUILDINGS $7,000 000.00

Delivery time: 90 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 30.000.00

Maximum order quantity: 7,000 000.00

Credit days: 60 DAYS

Download Cover Letter

PIVECO, S.A. OF C.V.

Description:GENERAL CONSTRUCTION, ELECTRICAL AND MECHANICAL INSTALLATIONS, PAILERY, METAL ROOFS.

Delivery time: 100 DAYS

Social security: YES

Certificación: YES

Minimum order quantity: 200 M2

Maximum order quantity: WHAT THE CUSTOMER REQUIRES

Credit days: 30 DAYS

Download Cover Letter

TEAMB ALTERNATIVE APPLIED AMBIENTAL SA OF CV

Description:SLOTS DESINCORPORATION, DISINCORPORATION OF RESIDUAL WATER AVERAGE COST OF 40M3 PIPES $20,000 MONTHLY POLICIES FOR MAINTENANCE AND OPERATION OF WWTP $40,000

Delivery time: 2 WEEKS

Social security: YES

Certificación: YES

Minimum order quantity: 1

Maximum order quantity: 100

Credit days: 15 BUSINESS DAYS

Download Cover Letter